Well the project is rocking right along. The Chinese New Year is over and I have an update that my order for the 4-pin waterproof connectors are on the way !! David over at HolidayCoro updated the tops of my CandyCanes for me and I have those in hand. I have built/rebuilt the controller boxes for the DMX bridge and the pixel controller.
Things are going very well. As soon as the connectors arrive, I should be able to complete the project and start programming. I have also STARTED the How-To on the Candy Cane build. Please take a look at the How-To page. I have broken the process in to two parts. I have Part 1 completed and when the connectors arrive and I start the completion I will update part 2. I also included a short video link in Part 1
0 Comments
Leave a Reply. |
AuthorBob and Sandra Moody. Archives
May 2016
Categories |