Well it may not look like it but I think we are ahead of schedule (If you call running around like a mad man a schedule !!) Actually, to me the hard part is generally done. Setting out the controllers, running power and network cables has always been the most trying part for me. As it turns out, this year went really smooth. A lot of that is because we did so much in prior years to make custom power and network cables etc.. I would say that we get better at it every year .... but ... well I'll just leave that as a thought .. Initial testing shows everything so far to be spot on.
Tomorrow the BIG PUSH... layout the yard grid finish the yard and install the MERRY CHRISTMAS sign. REALLY hoping to continue testing and make a sneak peak run through the w
0 Comments
Leave a Reply. |
AuthorBob and Sandra Moody. Archives
May 2016
Categories |