Greetings to all... well we are in FULL swing on getting the display up and running. We finished all the porch setup today (Bellagio poles, rail wraps, wreaths, windows and bells) including wiring and testing !!
We also go the NEW AND IMPROVED MegaTree out, wired and installed..... Still a few "clean up" items to attend to on the MegaTree but we got WAY more done today that I would have ever imagined.. Tomorrow starts round two. A trip to Home Depot to finish added the second network cable from the office to outside for DMX, bricks for the MERRY CHRISTMAS sign then back to work !! The 22nd with be here in NO TIME .. so.. back to work we go !!
0 Comments
Leave a Reply. |
AuthorBob and Sandra Moody. Archives
May 2016
Categories |